UCOSP

Undergraduate Capstone Open Source Projects

Marking Scheme for ElmCity project

Posted by Nikita Pchelin on 2009/10/30

Mark Breakdown

1. Individual (50%)

a) 40% – participation:

  • 20% code contributions
  • 10% discussions on friendfeed and google code wiki throughout the term
  • 10% weekly punchlines and how they were met (trackable through the “status” portion)

b) 10% – written component

2. Team (50%)

a) 30% Features and Functionality:

  • all the existing functionality up-to-date (plugins, events filtering, timezones management) still works as expected (test don’t fail), existing bookmarks on delicious produce valid iCal feeds
  • generalized parser that can at least recognize a minimum set of information for the event (date & time, title, and a link) on each of the pages listed here. If for some reason some of the page(s) are odd and cannot be parsed by the generalized plug-in, we must opt-out for completing a site-specific plug-in. If time permits, (outside 30%) we are targeting pages on here and too
  • product has to be ready to be shipped. That is, we have to have a document that describes all the third party libraries (and software) one may need to yank a fresh copy from google code and start working with the code. We can include general steps (i. e. have mysql, phpmyadmin installed and working), but whatever concerns the project itself must be specific (i. e. what file do I edit to change the location of calendar folder?)

b) 10% system has a clear documentation (comments inside the files, high-level description of the system) that could potentially allow other people to contribute to the project. Tests has been implemented (unit and integration) and run smoothly.

c) 10% written report + youtube presentation of the service, that describes what work has been done through out the term, demonstrates the abilities of the project, touches on the future of the project (i.e. if we were to continue, what are things that are missing and that we’d wanted to implement in the future)

2 Responses to “Marking Scheme for ElmCity project”

  1. […] went over and finalized our grading scheme, including exactly what functionality we hope to have achieved by the 29th of […]

  2. […] ElmCity […]

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

 
Follow

Get every new post delivered to your Inbox.

%d bloggers like this: