Peter

Status

  • Finished two tutorials on loops and iterators.

Next Steps

  • Team met up on IRC and decided that we’ll have meetings twice weekly.
  • Decided to switch gears and work as a team on the scheme perspective.
  • Chosen to work on the help and code navigation Work Arounds
  • Sent an email to our student union to see if they will pop the link to survey into the weekly newsletter.

Roadblocks

  • 3 projects and a midterm in the next 3 weeks

Dennis

Status

  • Fixed/re-uploaded the usability survey
  • Investigating SISC licensing issue

Next Steps

  • Team met up on IRC and decided that we’ll have meetings twice weekly.
  • Decided to switch gears and work as a team on the scheme perspective.
  • Will look at integrating a REPL view once SISC licensing is resolved

Roadblocks

  • Exams/assignments

Nil

Status

  • For the Thursday IRC meeting, made a list of what needs to be done if we want to have a great Scheme product. Working with Maxime on this task since Tuesday, so we were helping each other.
  • With Maxime, took SchemeWay to do the Scheme perspective(293093), outline and editor. As for now, it is SchemeWay without modification, but we will take some time to remove the stuff we don’t need before submitting it on bugzilla.

Next Steps

  • Team met up on IRC and decided that we’ll have meetings twice weekly.
  • Decided to switch gears and work as a team on the scheme perspective.
  • Consolidate Scheme changes and put them on the bugzilla for the IP team to have a look.

Roadblocks

  • None

Maxime

Status

  • Changed the Scheme files that had licensing issues in the scheme interpreter, and managed to make a build and run with those changes.
  • Contacted the SISC community to ask them if this can get integrated in the main SISC source control so we can update to the latest SISC without
    having to worry about those changes in the future.
  • I made pie charts from the survey that I have did with Sherbrooke students. They have been posted to the ucosp blog.
  • Worked with Nil on the scheme perspective Bug # 293093, Have set-up a minimal perspective with an editor by starting from the Schemeway project and
    removing all useless dependencies. Once the cleanup is finish we will put it on the bugzilla.

Next Steps

  • Team met up on IRC and decided that we’ll have meetings twice weekly.
  • Decided to switch gears and work as a team on the scheme perspective.
  • Consolidate Scheme changes and put them on the bugzilla for the IP team to have a look.

Roadblocks

  • None

Maciej

Status

  • Working on two more tutorials and will send them to Peter later this week. We now have Variables, Expressions, Arrays, Methods, and If Then Else. Peter is finishing up the looping structures and we will submit everything when he’s finished.
  • Used my brother (gr. 11 taking his first programming class) as a test subject to go through the tutorials and see if everything makes sense.

Next Steps

  • Team met up on IRC and decided that we’ll have meetings twice weekly.
  • Decided to switch gears and work as a team on the scheme perspective.
  • Working with Dennis on bug 293850 (Add REPL view to Scheme Perspective)

Roadblocks

  • None

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

 
%d bloggers like this: